Frequently Asked Questions

Straight answers about wrapping your home, grants, and what to expect on site.

Up to €8,000 SEAI grant · whole-surface external wrap

SEAI contractor ID 17645 · Kildare

NSAI ETICS IAB/E526.1

Grants, install & living on site

Still unsure? Email contact@externalwrap.ie or send a photo enquiry and we will call you back.

While we work on your wrap

Will I need to vacate my property?

We do not foresee the need for anyone to vacate their property, and we aim for residents to be able to remain in their properties for the duration of the works. Only in the case of health and safety concerns might residents be required to vacate the premises.

Will there be any disruption?

The contractor will need to erect scaffolding and you will experience some noise as the contractors go about preparing the walls and fixing the insulation materials to the existing surface.  The contractor may need to store items in your garden throughout the course of the installation. The contractor will keep mess and disruption to a minimum and will communicate with you regularly.

Will I need to do any preparation work?

Garden furniture/plants/ornaments/sheds that are next to or in contact with the walls of your property will have to be moved before the work can go ahead. If you are unable to move them, the contractor may be able to assist. You might also need to move any vehicle(s) including any caravans from your driveway and might be asked to cut back any bushes/trees. This will be discussed with you by the contractor at the survey stage.

How much does external wrap cost?

Every job is different , please arrange a call out / site survey for accurate quote.

Grants & eligibility

What is a whole-house external wrap?

It means insulating the outside of your home on all walls that can take it — not just the front or one side. SEAI only pays the grant when the wrap is done properly as a full job. Partial wrapping usually will not qualify.

Am I eligible for the SEAI wall insulation grant?

In most cases you need to own the home, and it must have been built and lived in before the end of 2010. You also need your electricity meter number (MPRN). The wrap must cover the whole suitable wall surface. You apply and get approval before work starts. After the job, a BER assessor rates the home again and paperwork is signed before SEAI pays the grant. Our grant approval form walks you through it.

Do I need attic insulation already before I can get a wrap grant?

No. You do not need the attic done first just to apply for external wrap. But a full wrap is a big job under building rules, so attic and heating often need upgrading as part of the project — see the next question.

Will I also need attic or heating upgrades with the wrap?

Often yes. A typical full wrap counts as a “major renovation” under building regulations (Part L), because it changes more than a quarter of the outside of the house. For the grant to be paid, SEAI expects either: the home reaches a B2 energy rating, or your attic insulation and heating system are brought up to the current building standards. That does not mean internal dry lining first — it means the attic (roof space) and heating, unless the house already reaches B2 another way. We check this at the survey and plan any attic or heating work with the wrap if needed.

Is that the same as the windows and doors grant rules?

No — they are different. For windows and doors, SEAI wants the attic and walls to already be in good shape (or a low enough heat-loss score) before that grant applies. For external wrap, you do not need that first. In fact, the wrap is often what improves the walls so windows and doors can qualify later or in the same project. We explain both routes clearly at survey.

What about older or traditional buildings?

Homes built before about 1940, or solid stone/brick traditional walls, need extra care for moisture and how the building “breathes”. The normal SEAI wall insulation grant usually does not cover those homes — there is a separate Traditional Homes scheme instead. Tell us the age and wall type early and we will point you the right way. Guides are linked further down this page.

What paperwork will I need to sign?

You apply through SEAI, get a letter of offer, and later sign a Declaration of Works when the job is finished. You also need a new BER certificate after the works. Our grant approval form and the official PDFs below explain each step in plain language.

Windows & doors grants

Is there a grant for windows and external doors?

Yes. SEAI now offers grants for better windows and external doors (from 2026). For a typical semi-detached or end-terrace house that can be up to €3,000 for windows and €800 per external door (maximum two doors, so €1,600). Detached houses can get more for windows — up to €4,000. Use the calculator on our grant approval form to see figures for your house type.

Do I need insulation before I can claim windows or doors?

Yes. Unlike the wrap grant, windows and doors have a fabric rule. The home should be built and lived in before 2011, and the attic and walls should already be good — or improved before or at the same time. SEAI checks this using your BER report (“Good” or “Very Good” for attic and walls), previous SEAI insulation grants, or a heat-loss score of 2.3 or better. New windows and doors must also meet a strong energy standard. If your walls are still cold and thin, an external wrap is often the step that makes windows and doors eligible.

Can I do a wrap and new windows or doors together?

Yes. Many homeowners do, because the wrap changes the edges around windows and doors. Planning both together usually looks neater and avoids rework. Apply for each grant before work starts where required. Mention windows or doors when you send photos or book a survey so we can plan the details.

Does External Wrap supply the windows and doors?

Yes. We supply windows and external doors through our specialist supplier and can include them in the same project as your wrap. Tell us early so we can line up grants, delivery times, and how the wrap meets the new frames.

What happens to my existing windows and doors during a wrap?

We protect them during the works (including film where needed) and adjust the surrounds and sills to suit the thicker insulated wall. Replacing windows or doors is a separate upgrade — if you plan to replace them, decide the order before we start so everything finishes cleanly.

Before work starts

How long will the work take?

Most houses take about one to two weeks on site. Bigger homes, awkward details, or bad weather can add time. Winter work is possible, but wet or frosty days can delay the final render.

Will I need to move out?

Usually no. Most families stay at home for the whole job. You would only need to leave if there was a serious health or safety issue.

Will there be scaffolding on my house?

Yes. Scaffold is needed so the crew can reach the full wall safely. It usually stays up for most of the project. Tell your home insurer when scaffold goes up, and keep children away from it.

What do I need to prepare?

Clear furniture, pots, and items near the walls — roughly within about 4 metres. You may need to move cars or a caravan off the driveway. Bushes and trees might need a trim. We go through all of this at the survey.

During the installation

Will there be noise or mess?

Yes — this is building work. Expect scaffolding, drilling, fixing boards, and rendering in daylight hours. We protect windows and tidy as we go, but some dust and mess is normal. Keep doors and windows closed on dusty days.

What happens to pipes and fittings on the walls?

Downpipes, soil pipes, flues, window sills, and outdoor taps are usually extended to suit the thicker wall. Air vents that need to stay open are kept working. Do not hang heavy items on the new insulation — it is not meant to take that load. Extra notices may apply for gas, ventilation, or electricity cables — see the guides below.

Will satellite TV or my alarm be affected?

Dishes and aerials are taken down and often put back temporarily on the scaffold. You may lose signal for a short time. For alarms, we recommend your alarm company removes and refits the equipment.

Will my water or electricity be turned off?

Water and power are not normally cut off for a wrap. If you have gas flues that need extending, a Registered Gas Installer may need to do that work as part of the job.

After completion

How is the work guaranteed?

You get a manufacturer system warranty and an insurance-backed guarantee when the job is finished. The details come with your handover pack.

Do I need planning permission?

Sometimes. External wrap can need planning permission depending on your area and house. We flag this early; you should also check with your local authority before works begin. You get completion documents when the job is done.

When do I pay?

Your contract sets out the payment stages. The SEAI grant is claimed after the work is finished, the new BER is done, and the paperwork is approved.

Should I tell my insurer or mortgage provider?

Yes. Tell both before work starts and while scaffolding is up. If you want extra peace of mind, you can also speak to a solicitor.

Official guides & PDFs

Useful SEAI and NSAI documents if you want the official detail. Start with the short guides; the PDFs are there when you need them.

Windows and doors grants

New SEAI individual grant support for efficient windows and external doors — often planned alongside a wrap.

For grant amounts and eligibility in one place, see our grant approval form. For the full handover document list, see the grant documents page.

SEAI and NSAI accreditations for Energy Retrofit Ireland