Project summary with the installed system, completion checks and handover status for your home.
Generated for your home
What you receive at handover, what SEAI may ask for on the grant route, and the official PDFs homeowners use alongside our grant roadmap.
Up to €8,000 SEAI grant · whole-surface external wrap
SEAI contractor ID 17645 · Kildare
NSAI ETICS IAB/E526.1
Official SEAI & NSAI PDFs
Project records are prepared for your home. Official PDFs open from the SEAI, NSAI and Gas Networks publishers.
Certificates, warranty and care guidance for your wrapped home, plus BER records when a grant applies.
Prepared for your address at completion — not generic downloads. Official reference PDFs are listed below.
Project summary with the installed system, completion checks and handover status for your home.
Generated for your home
Manufacturer warranty for the insulation system installed on your property.
Completed at handover
How to inspect, clean and maintain the external finish, fixings and service penetrations.
Generated for your home
Issued by your BER assessor after the post-works assessment is published.
From your BER assessor
Supplied with the post-works BER when a grant route applies.
From your BER assessor
Extra notices and certificates only if your home needs ESBN, ventilation, gas, window or door evidence.
These records are included only when the survey shows they apply.
Completed where the electricity service cable is affected by the wrap.
Completed when relevant
Used only where required wet-room extract has not been installed before wall insulation.
Completed when relevant
Provided where a new or upgraded ventilation system was installed and balanced.
From your installer
Independent validator certificate where major renovation validation applies.
From your validator
Registered Gas Installer certificate where gas pipework, meters or flues were affected.
From your RGI
Site certificate, declarations of performance, warranty and operating information when window or door measures apply.
Completed when relevant
Official SEAI forms and guides for applying, completing works, BER and drawing down the grant.
SEAI sends these for your application — not prepared by the contractor. Official guides and forms are listed below.
SEAI issues the grant offer after your application is approved. Keep the acceptance evidence on file.
Issued by SEAI
Project-specific SEAI forms for external wall insulation, windows, doors and post-works BER. Completed by the homeowner, contractor and BER assessor.
Issued by SEAI
Homeowner claim form issued with the SEAI approval pack to draw down the grant after works and BER are complete.
Issued by SEAI
25 PDFs from SEAI.ie tracked for EWI, Better Energy Homes and Warmer Homes. 25 on this server — all mirrored locally. Checked 21 August 2026.
Standard handover records apply to every wrap. Extra safety or service records are included only when your home needs them. SEAI grant forms are issued by SEAI — our grant roadmap walks through the order of tasks.